Industrial


City of Lynnwood Wastewater Treatment Plant Phase I

Energy Savings Performance Contract project reduces energy use by 247,116 kWh, and annual maintenance and operational costs by $29,667; qualifies for energy incentives estimated at more than $53,000; extends critical system life; helps avoid planned capital replacement costs totaling more than $2.8 million over the next ten years.

Read More

City of Lynnwood Wastewater Treatment Plant Phase II

Energy Savings Performance Contract project increases sewer system capacity; reduces surcharges and flooding; expected to save 31,690 kWh annually; qualifies for energy conservation incentives estimated at $6,338.

Read More

City of Lynnwood Wastewater Treatment Plant Phase III

Aeration system upgrades expected to achieve guaranteed utility cost reductions totaling 206,482 kWh per year; qualify for utility company incentives of approximately $55,000; maintenance and operational cost reductions estimated at $5,000 annually.

Read More

Monroe Wastewater Treatment Plant (Phase II)

Energy savings performance contract upgrades increase treatment capacity, maximize system life, and reduce energy costs; project on track to lower energy use by 86,652 kWh a year, and operational and maintenance costs by $8,000 annually; helping to avoid planned capital replacement costs of more than $5.2 million in the next ten years.

Read More

City of Bremerton

Energy Savings Performance Contract enables upgrades at wastewater plant without significant staff time investment; two-phase project realizes annual savings of $167,000 in energy and $30,000 in maintenance, $500,000 in grants and $400,000 in incentives.

Read More