Skip to content
Select Your Language

Selecting a language changes the language and content on the Trane site.

  • United States English
  • Canada English French
  • Argentina Spanish
  • Mexico Spanish
  • Brazil Portuguese
  • Aruba English
  • Bahamas English
  • Belize English
  • Bermuda English
  • Bolivia Spanish
  • Bonaire English
  • Chile Spanish
  • Colombia Spanish
  • Costa Rica Spanish
  • Dominican Republic Spanish
  • Ecuador Spanish
  • El Salvador Spanish
  • Grenada English
  • Guadeloupe English
  • Guatemala Spanish
  • Guyana English
  • Haiti English
  • Jamaica English
  • Martinique English
  • Netherland Antilles English
  • Nicaragua Spanish
  • Panama Spanish
  • Paraguay Spanish
  • Peru Spanish
  • Puerto Rico Spanish
  • Saint Lucia English
  • St. Vincent & Grenadines English
  • Suriname English
  • Trinidad & Tobago English
  • Venezuela Spanish
  • Armenia English
  • Austria German
  • Azerbaijan English
  • Belgium French Dutch English
  • Croatia Croatian
  • Czech Republic Czech
  • Denmark English
  • Estonia English
  • Finland English
  • France French
  • Georgia English
  • Germany German
  • Greece Greek
  • Hungary Hungarian
  • Israel English Hebrew
  • Ireland English
  • Italy Italian
  • Kazakhstan English
  • Kyrgyzstan Russian
  • Latvia English
  • Lithuania English
  • Luxembourg French German
  • The Netherlands Dutch
  • Norway English
  • Poland Polish
  • Portugal Portuguese
  • Romania Romanian
  • Serbia English
  • Slovakia Czech
  • Slovenia English
  • Spain Spanish
  • Sweden Swedish
  • Switzerland French German Italian
  • Turkey Turkish
  • Ukraine English
  • United Kingdom English
  • Tajikistan Russian
  • Turkmenistan Russian
  • Uzbekistan Russian
  • United Arab Emirates English
  • Qatar English
  • Kuwait English
  • Egypt English
  • Lebanon English
  • China Simplified Chinese English
  • Korea, Republic of (South Korea) Korean English
  • Vietnam Vietnamese English
  • India English
  • Australia English
  • Japan Japanese
  • Guam English
  • Thailand Thai English
  • Taiwan Traditional Chinese English
  • Hong Kong SAR English
  • Indonesia English
  • Malaysia English
  • Philippines English
  • Singapore English
  • New Zealand English

ComfortSite Login

Trane ComfortSite is an extranet site designed to save you time. With your secure login, you can:

  • Order Equipment, Parts, Literature and track Order Status
  • View product literature
  • Register for Training programs
  • Complete Warranty requirements online
  • Search for specific Product Information
  • Use interactive Product Support functions
  • View and print invoices through Account Track Online
  • and More
Log In

Trane Connect

This is the login for Trane® Connect™ and other Trane® commercial applications. Trane® Connect™ is our secure, cloud-based customer portal to access your building systems to remotely monitor and manage building systems, and conduct routine maintenance.

Log In
Trane Commercial
  • Products
    • Products

    • Air Handling
      • Air Handling
      • Performance Air Handlers
      • Air Handlers for Data Centers
      • Variable-Air-Volume Units
      • Terminal Units
      • Air Rotation Units
      • Unit Heaters
    • Chillers
      • Chillers
      • Air-Cooled Chillers
      • Chiller Heaters
      • Modular Chillers
      • Process Chillers
      • Water-Cooled Chillers
    • Design & Analysis Software
      • Design & Analysis Software
      • TRACE®
      • Trane® Design Assist™
      • myC02e™
      • myPLV®
      • Trane® Select Assist™
      • System Analyzer
    • Heat Pumps
      • Heat Pumps
      • Heat Pump Chillers
      • Domestic Hot Water Heat Pump
    • Liquid Cooling Systems
      • Liquid Cooling Systems
      • Coolant Distribution Unit (CDU)
    • Packaged Units & Split Systems
      • Packaged Units & Split Systems
      • Dedicated Outdoor Air Units
      • Rooftop Units
      • Self-Contained Units
      • Split Systems
      • Water Source Heat Pumps
    • Thermal Energy Storage
      • Thermal Energy Storage
      • Thermal Battery Systems
      • Thermal Energy Storage Solutions
    • Trane Drives
      • Trane Drives
      • TR200 Variable Frequency Drive
    • Smart Buildings
      • Smart Buildings
      • AI Solutions
      • Building Control Solutions
      • Cybersecurity
      • Digital Technology
      • Equipment Controls
      • Systems Integration
    • VRF & Ductless Solutions
      • VRF & Ductless Solutions
      • N-Gen CITY MULTI VRF
      • HVRF
      • Mini-Splits
    • Systems
      • Systems
      • Comprehensive Heat Pump Chiller Systems
      • Comprehensive Chilled Water Systems
      • Geothermal Systems
      • Indoor Agriculture System
      • Intelligent VAV Systems
      • Thermal Battery Systems
      • VRF Systems
      • Zoned Rooftop Systems
  • Services
    • Services

    • Optimization
      • Optimization
      • Energy Efficiency
      • Controls Upgrades
      • HVAC Upgrades
    • Repair & Maintain
      • Repair & Maintain
      • Controls System Maintenance
      • HVAC Maintenance
      • HVAC System Repair
      • Warranty
    • Rentals
      • Rentals
      • Contingency Planning
      • Emergency Response
      • Planned Maintenance
    • Sustainability & Resiliency
      • Sustainability & Resiliency
      • Decarbonization Solutions
      • Resiliency Solutions
    • Whole Building Solutions
      • Whole Building Solutions
      • Building Modernization
      • Energy Services
  • Support
    • Support

    • Financing
      • Financing
      • Anticipation Discount Program
      • Financial Services
    • Incentives
    • Regulations
      • Regulations
      • Building Performance Standards
    • Utilities
      • Utilities
      • Rebate Finder
      • Utility Credentials
      • BIM Library
      • Software Downloads
      • Document Finder
      • Trane C.D.S. Software Support
  • Education & Training
    • Education & Training

    • Training
      • Training
      • Trane University
      • Trane Education Center
      • Design & Analysis Tools Training
      • Engineers Newsletters & Engineers Newsletters Live!
    • Roles
      • Roles
      • Engineers
      • Contractors
      • Facility Managers
  • Industries
    • Industries

    • Commercial Real Estate
    • Data Centers
    • Federal Government
    • Healthcare
    • Higher Education
    • High Tech
    • Industrial
    • K-12
    • Local & State Government
    • National Accounts
  • About
    • About

    • About Us
    • Contact Us
    • Locate a Sales Office
    • Trane Newsroom
    • Customer Stories
    • Trane Blog
    • Events & Webinars
    • Press Releases
    • Glossary
    • ComfortSite Login
    • Trane Connect
      • North America

      • United States English
      • Canada English French
      • Latin America

      • Argentina Spanish
      • Mexico Spanish
      • Brazil Portuguese
      • Aruba English
      • Bahamas English
      • Belize English
      • Bermuda English
      • Bolivia Spanish
      • Bonaire English
      • Chile Spanish
      • Colombia Spanish
      • Costa Rica Spanish
      • Dominican Republic Spanish
      • Ecuador Spanish
      • El Salvador Spanish
      • Grenada English
      • Guadeloupe English
      • Guatemala Spanish
      • Guyana English
      • Haiti English
      • Jamaica English
      • Martinique English
      • Netherland Antilles English
      • Nicaragua Spanish
      • Panama Spanish
      • Paraguay Spanish
      • Peru Spanish
      • Puerto Rico Spanish
      • Saint Lucia English
      • St. Vincent & Grenadines English
      • Suriname English
      • Trinidad & Tobago English
      • Venezuela Spanish
      • Europe

      • Armenia English
      • Austria German
      • Azerbaijan English
      • Belgium French Dutch English
      • Croatia Croatian
      • Czech Republic Czech
      • Denmark English
      • Estonia English
      • Finland English
      • France French
      • Georgia English
      • Germany German
      • Greece Greek
      • Hungary Hungarian
      • Israel English Hebrew
      • Ireland English
      • Italy Italian
      • Kazakhstan English
      • Kyrgyzstan Russian
      • Latvia English
      • Lithuania English
      • Luxembourg French German
      • The Netherlands Dutch
      • Norway English
      • Poland Polish
      • Portugal Portuguese
      • Romania Romanian
      • Serbia English
      • Slovakia Czech
      • Slovenia English
      • Spain Spanish
      • Sweden Swedish
      • Switzerland French German Italian
      • Turkey Turkish
      • Ukraine English
      • United Kingdom English
      • Tajikistan Russian
      • Turkmenistan Russian
      • Uzbekistan Russian
      • Middle East

      • United Arab Emirates English
      • Qatar English
      • Kuwait English
      • Egypt English
      • Lebanon English
      • Asia Pacific

      • China Simplified Chinese English
      • Korea, Republic of (South Korea) Korean English
      • Vietnam Vietnamese English
      • India English
      • Australia English
      • Japan Japanese
      • Guam English
      • Thailand Thai English
      • Taiwan Traditional Chinese English
      • Hong Kong SAR English
      • Indonesia English
      • Malaysia English
      • Philippines English
      • Singapore English
      • New Zealand English
  • Air Handling
  • Performance Air Handlers
  • Air Handlers for Data Centers
  • Variable-Air-Volume Units
  • Terminal Units
  • Air Rotation Units
  • Unit Heaters
  • Chillers
  • Air-Cooled Chillers
  • Chiller Heaters
  • Modular Chillers
  • Process Chillers
  • Water-Cooled Chillers
  • Heat Pumps
  • Heat Pump Chillers
  • Domestic Hot Water Heat Pump
  • Thermal Energy Storage
  • Thermal Battery Systems
  • Thermal Energy Storage Solutions
  • Packaged Units & Split Systems
  • Dedicated Outdoor Air Units
  • Rooftop Units
  • Self-Contained Units
  • Split Systems
  • Water Source Heat Pumps
  • VRF & Ductless Solutions
  • N-Gen CITY MULTI VRF
  • HVRF
  • Mini-Splits
  • Systems
  • Comprehensive Heat Pump Chiller Systems
  • Comprehensive Chilled Water Systems
  • Geothermal Systems
  • Indoor Agriculture System
  • Intelligent VAV Systems
  • Thermal Battery Systems
  • VRF Systems
  • Zoned Rooftop Systems
  • Design & Analysis Software
  • TRACE®
  • Trane® Design Assist™
  • myC02e™
  • myPLV®
  • Trane® Select Assist™
  • System Analyzer
  • Liquid Cooling Systems
  • Coolant Distribution Unit (CDU)
  • Trane Drives
  • TR200 Variable Frequency Drive
  • Smart Buildings
  • AI Solutions
  • Building Control Solutions
  • Cybersecurity
  • Digital Technology
  • Equipment Controls
  • Systems Integration
  • Optimization
  • Energy Efficiency
  • Controls Upgrades
  • HVAC Upgrades
  • Sustainability & Resiliency
  • Decarbonization Solutions
  • Resiliency Solutions
  • Repair & Maintain
  • Controls System Maintenance
  • HVAC Maintenance
  • HVAC System Repair
  • Warranty
  • Whole Building Solutions
  • Building Modernization
  • Energy Services
  • Rentals
  • Contingency Planning
  • Emergency Response
  • Planned Maintenance
  • Utilities
  • Rebate Finder
  • Utility Credentials
  • BIM Library
  • Software Downloads
  • Document Finder
  • Trane C.D.S. Software Support
  • Financing
  • Anticipation Discount Program
  • Financial Services
  • Incentives
  • Regulations
  • Building Performance Standards
  • Training
  • Trane University
  • Trane Education Center
  • Design & Analysis Tools Training
  • Engineers Newsletters & Engineers Newsletters Live!
  • Roles
  • Engineers
  • Contractors
  • Facility Managers
  • Commercial Real Estate
  • Data Centers
  • Federal Government
  • Healthcare
  • Higher Education
  • High Tech
  • Industrial
  • K-12
  • Local & State Government
  • National Accounts
  • About Us
  • Contact Us
  • Locate a Sales Office
  • Glossary
  • Trane Newsroom
  • Customer Stories
  • Trane Blog
  • Events & Webinars
  • Press Releases
Find Trane Rep

Blog

Published: October 30, 2015

Emergency Contingency Planning: 7 Steps Hospitals and Schools Must Follow

Extreme weather conditions underscore the need for facility teams to prepare for the worst that nature can throw at their buildings. Given their critical missions, healthcare and educational organizations must be prepared to respond quickly and efficiently when a blizzard, flood, tornado, hurricane or other disaster — natural or man-made — strikes...

Emergency Contingency Planning: 7 Steps Hospitals and Schools Must Follow

By: Trane Commercial

October 30, 2015

Extreme weather conditions underscore the need for facility teams to prepare for the worst that nature can throw at their buildings. Given their critical missions, healthcare and educational organizations must be prepared to respond quickly and efficiently when a blizzard, flood, tornado, hurricane or other disaster — natural or man-made — strikes.

Regardless of the disaster and when it occurs, the damage must always be quickly addressed to get the building back on line as soon as possible. In hospitals and schools, even a short interruption of electric power or heating, ventilation and air conditioning (HVAC) can put building occupants at risk — causing millions of dollars in damage, disrupting operations and eroding the confidence of the community.

That’s why it’s critical for organizations to have an effective, proactive power and HVAC contingency plan in place. Not only can it reduce financial risk, the contingency plan can help protect the health and safety of building occupants, and increase peace of mind for the organization and its stakeholders.

Contingency plans help expedite disaster recovery

The power and HVAC contingency plan should be integrated into the broader hospital or school system crisis-preparedness plan.

Here are seven steps organizations can use to evaluate, analyze, create and implement a contingency plan that meets their specific needs:

1 - Assess the financial, operational and stakeholder impact of a disruption in power or HVAC service. Experienced contingency service providers like Trane can help hospitals and schools estimate the true costs of unplanned downtime, which go far beyond the cost of repairing mechanical equipment during a time of crisis.

2- Identify potential causes of system failure, including natural disasters, power outages, equipment failures, fires or even sabotage. Rank these causes based on their probability, potential to disrupt normal operations, and financial cost. Remember to include the full range of direct and indirect costs, including equipment repair and replacement costs and the cost of the facility being out of commission for days or even weeks.

3- Conduct a critical system audit to identify mission-essential power and HVAC systems and assess their current operating condition. Address performance problems and document potential failure points. Many organizations will engage a third-party expert like Trane to help with their audit.

4 - Identify areas within the hospital or school that would have the greatest impact on mission-essential operations and the bottom line if an unplanned service interruption were to occur in these areas.

5 - Identify reliable, experienced contingency planning consultants and temporary equipment providers. These professionals have proven tools to ensure that the organization develops a complete, effective and useful contingency plan that does not simply gather dust.

6 - Consider the potential need for rental power and HVAC equipment. Temporary equipment ranges from portable dehumidification units that can be used to remove moisture from flooded areas to generators and chilled water systems that can take over the load while the building’s permanent equipment is out of commission. An HVAC rental services company can help develop and implement plans to meet heating and cooling needs when permanent systems are not available or cannot handle the job.

7 - Develop and implement the power and HVAC contingency plan. Provide training and conduct drills to verify the process and identify areas for improvement. Make required building modifications. Review and update the plan each year or when there is a significant change in the facility, such as a building modification or expansion.

Is your organization prepared for its next potential emergency?

Ensure the continuity of power and HVAC services in your hospital or school environment. Think about creating a robust contingency plan today — before disaster strikes. Contact Trane Building Advantage to take advantage of our contingency planning services.

This post was adapted from an article that originally appeared in the November 2014 edition of American School & Hospital facility. The complete article can be read here.

Looking For Parts?

Visit Trane Supply

For General and Corporate Questions:

Contact Us
  • Energy and Building Services
  • Products and Systems
  • Education & Training
  • Newsroom
  • About Us
  • Contact Us
  • Indoor Environmental Quality
  • Locate a Sales Office
  • Engineering Support
  • Contractor Support
  • Careers
  • Environmental Compliance
  • Quality
  • Ethical Business Conduct
  • Supplier Terms
  • Safety Data Sheets
  • Facebook
  • LinkedIn
  • YouTube

Privacy Policy  |   Terms of Use

All trademarks referenced are the trademarks of their respective owners.

© 2025 Trane. All Rights Reserved.

Trane Technologies