Skip to content
Select Your Language

Selecting a language changes the language and content on the Trane site.

  • United States English
  • Canada English French
  • Argentina Spanish
  • Mexico Spanish
  • Brazil Portuguese
  • Aruba English
  • Bahamas English
  • Belize English
  • Bermuda English
  • Bolivia Spanish
  • Bonaire English
  • Chile Spanish
  • Colombia Spanish
  • Costa Rica Spanish
  • Dominican Republic Spanish
  • Ecuador Spanish
  • El Salvador Spanish
  • Grenada English
  • Guadeloupe English
  • Guatemala Spanish
  • Guyana English
  • Haiti English
  • Jamaica English
  • Martinique English
  • Netherland Antilles English
  • Nicaragua Spanish
  • Panama Spanish
  • Paraguay Spanish
  • Peru Spanish
  • Puerto Rico Spanish
  • Saint Lucia English
  • St. Vincent & Grenadines English
  • Suriname English
  • Trinidad & Tobago English
  • Venezuela Spanish
  • Armenia English
  • Austria German
  • Azerbaijan English
  • Belgium French Dutch English
  • Croatia Croatian
  • Czech Republic Czech
  • Denmark English
  • Estonia English
  • Finland English
  • France French
  • Georgia English
  • Germany German
  • Greece Greek
  • Hungary Hungarian
  • Israel English Hebrew
  • Ireland English
  • Italy Italian
  • Kazakhstan English
  • Kyrgyzstan Russian
  • Latvia English
  • Lithuania English
  • Luxembourg French German
  • The Netherlands Dutch
  • Norway English
  • Poland Polish
  • Portugal Portuguese
  • Romania Romanian
  • Serbia English
  • Slovakia Czech
  • Slovenia English
  • Spain Spanish
  • Sweden Swedish
  • Switzerland French German Italian
  • Turkey Turkish
  • Ukraine English
  • United Kingdom English
  • Tajikistan Russian
  • Turkmenistan Russian
  • Uzbekistan Russian
  • United Arab Emirates English
  • Qatar English
  • Kuwait English
  • Egypt English
  • Lebanon English
  • China Simplified Chinese English
  • Korea, Republic of (South Korea) Korean English
  • Vietnam Vietnamese English
  • India English
  • Australia English
  • Japan Japanese
  • Guam English
  • Thailand Thai English
  • Taiwan Traditional Chinese English
  • Hong Kong SAR English
  • Indonesia English
  • Malaysia English
  • Philippines English
  • Singapore English
  • New Zealand English

ComfortSite Login

Trane ComfortSite is an extranet site designed to save you time. With your secure login, you can:

  • Order Equipment, Parts, Literature and track Order Status
  • View product literature
  • Register for Training programs
  • Complete Warranty requirements online
  • Search for specific Product Information
  • Use interactive Product Support functions
  • View and print invoices through Account Track Online
  • and More
Log In

Trane Connect

This is the login for Trane® Connect™ and other Trane® commercial applications. Trane® Connect™ is our secure, cloud-based customer portal to access your building systems to remotely monitor and manage building systems, and conduct routine maintenance.

Log In
Trane Commercial
  • Products
    • Products

    • Air Handling
      • Air Handling
      • Performance Air Handlers
      • Air Handlers for Data Centers
      • Variable-Air-Volume Units
      • Terminal Units
      • Air Rotation Units
      • Terminal Units
      • Unit Heaters
    • Chillers
      • Chillers
      • Air-Cooled Chillers
      • Chiller Heaters
      • Modular Chillers
      • Process Chillers
      • Water-Cooled Chillers
    • Design & Analysis Software
      • Design & Analysis Software
      • TRACE®
      • Trane® Design Assist™
      • myC02e™
      • myPLV®
      • Trane® Select Assist™
      • System Analyzer
    • Heat Pumps
      • Heat Pumps
      • Heat Pump Chillers
      • Domestic Hot Water Heat Pump
    • Liquid Cooling Systems
      • Liquid Cooling Systems
      • Coolant Distribution Unit (CDU)
    • Packaged Units & Split Systems
      • Packaged Units & Split Systems
      • Dedicated Outdoor Air Units
      • Rooftop Units
      • Self-Contained Units
      • Split Systems
      • Water Source Heat Pumps
    • Thermal Energy Storage
      • Thermal Energy Storage
      • Thermal Battery Systems
      • Thermal Energy Storage Solutions
    • Trane Drives
      • Trane Drives
      • TR200 Variable Frequency Drive
    • Smart Buildings
      • Smart Buildings
      • AI Solutions
      • Building Control Solutions
      • Cybersecurity
      • Digital Technology
      • Equipment Controls
      • Systems Integration
    • Systems
      • Systems
      • Comprehensive Heat Pump Chiller Systems
      • Comprehensive Chilled Water Systems
      • CoolSense Systems
      • Geothermal Systems
      • Indoor Agriculture System
      • Intelligent VAV Systems
      • Thermal Battery Systems
      • VRF Systems
      • Zoned Rooftop Systems
  • Services
    • Services

    • Optimization
      • Optimization
      • Energy Efficiency
      • Controls Upgrades
      • HVAC Upgrades
    • Repair & Maintain
      • Repair & Maintain
      • Controls System Maintenance
      • HVAC Maintenance
      • HVAC System Repair
      • Warranty
    • Rentals
    • Sustainability & Resiliency
      • Sustainability & Resiliency
      • Decarbonization Solutions
      • Resiliency Solutions
    • Whole Building Solutions
      • Whole Building Solutions
      • Building Modernization
      • Energy Services
  • Education & Training
    • Education & Training

    • Education & Training
      • Education & Training
      • Trane University
      • Design & Analysis Tools Training
      • Engineers Newsletters & Engineers Newsletters Live!
    • Roles
      • Roles
      • Engineers
      • Contractors
      • Facility Managers
  • Industries
    • Industries

    • Commercial Real Estate
    • Data Centers
    • High Tech
    • Industrial
    • National Accounts
  • About
    • About

    • About Us
    • Contact Us
    • Locate a Sales Office
    • Trane Newsroom
    • Customer Stories
    • Trane Blog
    • Events & Webinars
    • Press Releases
    • ComfortSite Login
    • Trane Connect
      • North America

      • United States English
      • Canada English French
      • Latin America

      • Argentina Spanish
      • Mexico Spanish
      • Brazil Portuguese
      • Aruba English
      • Bahamas English
      • Belize English
      • Bermuda English
      • Bolivia Spanish
      • Bonaire English
      • Chile Spanish
      • Colombia Spanish
      • Costa Rica Spanish
      • Dominican Republic Spanish
      • Ecuador Spanish
      • El Salvador Spanish
      • Grenada English
      • Guadeloupe English
      • Guatemala Spanish
      • Guyana English
      • Haiti English
      • Jamaica English
      • Martinique English
      • Netherland Antilles English
      • Nicaragua Spanish
      • Panama Spanish
      • Paraguay Spanish
      • Peru Spanish
      • Puerto Rico Spanish
      • Saint Lucia English
      • St. Vincent & Grenadines English
      • Suriname English
      • Trinidad & Tobago English
      • Venezuela Spanish
      • Europe

      • Armenia English
      • Austria German
      • Azerbaijan English
      • Belgium French Dutch English
      • Croatia Croatian
      • Czech Republic Czech
      • Denmark English
      • Estonia English
      • Finland English
      • France French
      • Georgia English
      • Germany German
      • Greece Greek
      • Hungary Hungarian
      • Israel English Hebrew
      • Ireland English
      • Italy Italian
      • Kazakhstan English
      • Kyrgyzstan Russian
      • Latvia English
      • Lithuania English
      • Luxembourg French German
      • The Netherlands Dutch
      • Norway English
      • Poland Polish
      • Portugal Portuguese
      • Romania Romanian
      • Serbia English
      • Slovakia Czech
      • Slovenia English
      • Spain Spanish
      • Sweden Swedish
      • Switzerland French German Italian
      • Turkey Turkish
      • Ukraine English
      • United Kingdom English
      • Tajikistan Russian
      • Turkmenistan Russian
      • Uzbekistan Russian
      • Middle East

      • United Arab Emirates English
      • Qatar English
      • Kuwait English
      • Egypt English
      • Lebanon English
      • Asia Pacific

      • China Simplified Chinese English
      • Korea, Republic of (South Korea) Korean English
      • Vietnam Vietnamese English
      • India English
      • Australia English
      • Japan Japanese
      • Guam English
      • Thailand Thai English
      • Taiwan Traditional Chinese English
      • Hong Kong SAR English
      • Indonesia English
      • Malaysia English
      • Philippines English
      • Singapore English
      • New Zealand English
  • Air Handling
  • Performance Air Handlers
  • Air Handlers for Data Centers
  • Variable-Air-Volume Units
  • Terminal Units
  • Air Rotation Units
  • Terminal Units
  • Unit Heaters
  • Chillers
  • Air-Cooled Chillers
  • Chiller Heaters
  • Modular Chillers
  • Process Chillers
  • Water-Cooled Chillers
  • Heat Pumps
  • Heat Pump Chillers
  • Domestic Hot Water Heat Pump
  • Thermal Energy Storage
  • Thermal Battery Systems
  • Thermal Energy Storage Solutions
  • Packaged Units & Split Systems
  • Dedicated Outdoor Air Units
  • Rooftop Units
  • Self-Contained Units
  • Split Systems
  • Water Source Heat Pumps
  • Trane Drives
  • TR200 Variable Frequency Drive
  • Systems
  • Comprehensive Heat Pump Chiller Systems
  • Comprehensive Chilled Water Systems
  • CoolSense Systems
  • Geothermal Systems
  • Indoor Agriculture System
  • Intelligent VAV Systems
  • Thermal Battery Systems
  • VRF Systems
  • Zoned Rooftop Systems
  • Design & Analysis Software
  • TRACE®
  • Trane® Design Assist™
  • myC02e™
  • myPLV®
  • Trane® Select Assist™
  • System Analyzer
  • Liquid Cooling Systems
  • Coolant Distribution Unit (CDU)
  • Smart Buildings
  • AI Solutions
  • Building Control Solutions
  • Cybersecurity
  • Digital Technology
  • Equipment Controls
  • Systems Integration
  • Optimization
  • Energy Efficiency
  • Controls Upgrades
  • HVAC Upgrades
  • Sustainability & Resiliency
  • Decarbonization Solutions
  • Resiliency Solutions
  • Repair & Maintain
  • Controls System Maintenance
  • HVAC Maintenance
  • HVAC System Repair
  • Warranty
  • Whole Building Solutions
  • Building Modernization
  • Energy Services
  • Rentals
  • Education & Training
  • Trane University
  • Design & Analysis Tools Training
  • Engineers Newsletters & Engineers Newsletters Live!
  • Roles
  • Engineers
  • Contractors
  • Facility Managers
  • Commercial Real Estate
  • Data Centers
  • High Tech
  • Industrial
  • National Accounts
  • About Us
  • Contact Us
  • Locate a Sales Office
  • Trane Newsroom
  • Customer Stories
  • Trane Blog
  • Events & Webinars
  • Press Releases
Find Trane Rep

Blog

Published: October 16, 2017

Department of Energy Proposes Market Changes

On September 28th, the Department of Energy (DOE) proposed that the Federal Energy Regulatory Commission (FERC) require independent system operators make whole certain “baseload” energy generators. This is only the second time in the history that...

Department of Energy Proposes Market Changes

By: Trevor Sutherland

October 16, 2017

department of energy

On September 28th, the Department of Energy (DOE) proposed that the Federal Energy Regulatory Commission (FERC) require independent system operators make whole certain “baseload” energy generators.  This is only the second time in the history that the DOE has proposed FERC to make a ruling, with the other instance being in 1979.

This has been, to say the least, controversial.

There are three main sources of controversy with the proposed rule:

  • There were few details given in the proposal
  • The time frame for making a decision is quite ambitious, and
  • The effects that implementation would have on competitive power markets

The proposal is very sparse on details.  Per the order, facilities “able to provide essential energy and ancillary reliability services” and with a 90 day on-site fuel supply will be eligible for recovery of costs and a guaranteed rate of return.  Critically, it does not specify at what level the plant should be able to run for 90-days based on its fuel supply.  In 2016 the average coal plant ran at only one half of its rated capability, meaning that the difference between operating for 90 days at normal rates verses peak utilization would mean twice as much fuel would need to be stored on hand.  Similarly, there is no structure to penalize facilities that drop below the 90-day supply in non-emergency situations or fail to maintain reliability in emergency situations, as was seen during the winter of 2014.

The timeframe has also been highly criticized, as it requires a final decision be made within 60 days and go into effect no more than 30 days after that.  In an industry which companies routinely make multi-billion dollar infrastructure investments, regulatory changes tend to be slow and methodical to give all parties time to understand implications and plan accordingly.  Generation retirements, for example, are normally announced a year or more in advance to give the local power system operator time to evaluate the impacts and decide how best to proceed.  To completely change how generators are compensated in 90 days is much different to how things have happened in the past and could present difficulties as system operators figure out how to implement the changes.

Lastly, the effects that the rule would have on competitive power markets could be drastic.  While there are currently transfer payments made in these markets to generators with desirable characteristics, there is, by definition, no guaranteed rate of return as the rule proposes.  The proposal does leave the mechanics of implementation to the various ISOs, though in most markets this is would likely be accomplished via a monthly true-up.  Under this system, the difference between the guaranteed rate of return and the revenues earned in the market would be socialized, leading to higher end user costs.  Additionally, regulations would have to be formulated regarding how subsidized plants would be entered into capacity auctions, similar to rules in place for subsidized renewables.

While this proposed rule has drawn much criticism, FERC seems to be moving toward making a decision within the 60-day timeframe suggested.  Reactions from sitting commissioners have been decidedly mixed, with Acting-Chairperson Chatterjee generally supportive of the measure and Commissioners Powelson and La Fleur seemingly against it.  At present the commission is taking comments from the public and various stakeholders, after which it will issue its own comments before ultimately making a decision.

Trane and the Circle Logo are trademarks of Trane in the United States and other countries.

Looking For Parts?

Visit Trane Supply

For General and Corporate Questions:

Contact Us
  • Energy and Building Services
  • Products and Systems
  • Education & Training
  • Newsroom
  • About Us
  • Contact Us
  • Indoor Environmental Quality
  • Locate a Sales Office
  • Engineering Support
  • Contractor Support
  • Careers
  • Environmental Compliance
  • Quality
  • Ethical Business Conduct
  • Supplier Terms
  • Safety Data Sheets
  • LinkedIn
  • YouTube

Privacy Policy English | French 
Terms of Use English | French

All trademarks referenced are the trademarks of their respective owners.

© 2025 Trane. All Rights Reserved.

Trane Technologies