Skip to content
  • Looking for Parts? Visit Trane Supply
  • Education Plattform

Select Your Language

Selecting a language changes the language and content on the Trane site.

  • United States English
  • Canada English
  • Argentina Spanish
  • Mexico Spanish
  • Brazil Portuguese Spanish
  • Aruba English
  • Bahamas English
  • Belize English
  • Bermuda English
  • Bolivia Spanish
  • Bonaire English
  • Cayman Islands English
  • Chile Spanish
  • Colombia Spanish
  • Costa Rica Spanish
  • Curacao English
  • Dominican Republic Spanish
  • Ecuador Spanish
  • El Salvador Spanish
  • Grenada English
  • Guadeloupe English
  • Guatemala Spanish
  • Guyana English
  • Haiti English
  • Jamaica English
  • Martinique English
  • Netherland Antilles English
  • Nicaragua Spanish
  • Panama Spanish
  • Paraguay Spanish
  • Peru Spanish
  • Puerto Rico Spanish
  • Saint Lucia English
  • St. Vincent & Grenadines English
  • Suriname English
  • Trinidad & Tobago English
  • Venezuela Spanish
  • Armenia English
  • Austria German
  • Belarus Russian
  • Belgium English
  • Croatia English
  • Czech Republic Czech
  • Denmark English
  • Estonia English
  • Finland English
  • France French
  • Georgia English
  • Germany German
  • Greece Greek
  • Hungary Hungarian
  • Israel English
  • Ireland English
  • Italy Italian
  • Kazakhstan Russian
  • Latvia English
  • Lithuania English
  • The Netherlands Dutch
  • Norway English
  • Poland English
  • Portugal Portuguese
  • Romania English
  • Russia Russian
  • Serbia Russian
  • Slovakia Czech
  • Slovenia English
  • Spain Spanish
  • Sweden English
  • Switzerland French German Italian
  • Turkey Turkish
  • Ukraine English
  • United Kingdom English
  • Azerbaijan Русский
  • Tajikistan Русский
  • Uzbekistan Русский
  • Turkmenistan Русский
  • United Arab Emirates English Arabic
  • Qatar English
  • Kuwait English
  • Egypt English
  • Lebanon English Arabic French
  • Iraq English
  • Jordan English
  • Mainland of China 选择语言
  • Korea, Republic of (South Korea) Korean
  • Vietnam Vietnamese
  • India English
  • Australia English
  • Japan Japanese
  • Guam English
  • Thailand Thai
  • Taiwan Traditional Chinese
  • Hong Kong SAR English
  • Indonesia English
  • Malaysia English
  • Philippines English
  • Singapore English
  • New Zealand English
  • Services
    • Services
    • Energy & Sustainability
      • Energy & Sustainability
      • Energy Monitoring & Analysis
      • Energy Supply
      • Active Energy Management
      • Renewable Energy & Distributed Energy Resources
      • Energy Conservation Measures (energy efficiency)
    • Operate, Maintain & Repair
      • Operate, Maintain & Repair
      • Connectivity & Cloud Services
      • HVAC System Management
      • HVAC System Repair
      • Rental
    • Upgrade & Modernize
      • Upgrade & Modernize
      • Building Systems
      • HVAC System Retrofits
      • HVAC Equipment Upgrades
      • Financing & Energy Services Contracting
      • Indoor Air Quality Assessment
      • Ready for now
  • Products
    • Products
    • VRF & Ductless Solutions
      • VRF & Ductless Solutions
      • N-Gen CITY MULTI VRF
      • P Series
      • Nv Series
      • VRF System Design
    • Chillers
      • Chillers
      • Water-Cooled Chillers
      • Air-Cooled Chillers
      • Cold Gen Scroll Chillers
    • Packaged Units & Split Systems
      • Packaged Units & Split Systems
      • Rooftop Units
      • Split Systems
      • Self-Contained Units
      • Water Source Heat Pumps
      • Dedicated Outdoor Air Units
    • Energy Management & Controls
      • Energy Management & Controls
      • Building Management Systems
      • Building Automation Systems
      • Trane® Air-Fi™ Wireless Systems
      • Controllers
      • Thermostats
      • Accessories
    • Air Handling
      • Air Handling
      • Terminals
      • Sensible-Cooling Terminal Unit
      • VAV (Variable Air Volume) Units
      • Performance Air Handlers
      • Air Handling Accessories & Controls
    • Energy Storage
      • Energy Storage
      • Energy Storage Systems
    • Precision Cooling
      • Precision Cooling
      • Precision Cooling
    • Residential Units
  • Industries
    • Industries
    • Higher Education
    • Indoor Agriculture
    • K-12
    • Data Centers
    • Restaurants
    • Commercial Real Estate
    • Healthcare
    • Local Government
    • Hospitality
      • Hospitality
    • Industrial
  • About
    • About
    • About Us
    • Contact Us
    • Customer Stories
    • Looking for Parts? Visit Trane Supply
    • Education Plattform
    • North America
      • North America

      • United States English
      • Canada English
    • Latin America
      • Latin America

      • Argentina Spanish
      • Mexico Spanish
      • Brazil Portuguese Spanish
      • Aruba English
      • Bahamas English
      • Belize English
      • Bermuda English
      • Bolivia Spanish
      • Bonaire English
      • Cayman Islands English
      • Chile Spanish
      • Colombia Spanish
      • Costa Rica Spanish
      • Curacao English
      • Dominican Republic Spanish
      • Ecuador Spanish
      • El Salvador Spanish
      • Grenada English
      • Guadeloupe English
      • Guatemala Spanish
      • Guyana English
      • Haiti English
      • Jamaica English
      • Martinique English
      • Netherland Antilles English
      • Nicaragua Spanish
      • Panama Spanish
      • Paraguay Spanish
      • Peru Spanish
      • Puerto Rico Spanish
      • Saint Lucia English
      • St. Vincent & Grenadines English
      • Suriname English
      • Trinidad & Tobago English
      • Venezuela Spanish
    • Europe
      • Europe

      • Armenia English
      • Austria German
      • Belarus Russian
      • Belgium English
      • Croatia English
      • Czech Republic Czech
      • Denmark English
      • Estonia English
      • Finland English
      • France French
      • Georgia English
      • Germany German
      • Greece Greek
      • Hungary Hungarian
      • Israel English
      • Ireland English
      • Italy Italian
      • Kazakhstan Russian
      • Latvia English
      • Lithuania English
      • The Netherlands Dutch
      • Norway English
      • Poland English
      • Portugal Portuguese
      • Romania English
      • Russia Russian
      • Serbia Russian
      • Slovakia Czech
      • Slovenia English
      • Spain Spanish
      • Sweden English
      • Switzerland French German Italian
      • Turkey Turkish
      • Ukraine English
      • United Kingdom English
      • Azerbaijan Русский
      • Tajikistan Русский
      • Uzbekistan Русский
      • Turkmenistan Русский
    • Middle East
      • Middle East

      • United Arab Emirates English Arabic
      • Qatar English
      • Kuwait English
      • Egypt English
      • Lebanon English Arabic French
      • Iraq English
      • Jordan English
    • Asia Pacific
      • Asia Pacific

      • Mainland of China 选择语言
      • Korea, Republic of (South Korea) Korean
      • Vietnam Vietnamese
      • India English
      • Australia English
      • Japan Japanese
      • Guam English
      • Thailand Thai
      • Taiwan Traditional Chinese
      • Hong Kong SAR English
      • Indonesia English
      • Malaysia English
      • Philippines English
      • Singapore English
      • New Zealand English
  • Energy & Sustainability
  • Operate, Maintain & Repair
  • Upgrade & Modernize
  • Energy Monitoring & Analysis
    Energy Monitoring & Analysis
  • Energy Supply
    Energy Supply
  • Active Energy Management
    Active Energy Management
  • Renewable Energy & Distributed Energy Resources
    Renewable Energy & Distributed Energy Resources
  • Energy Conservation Measures (energy efficiency)
    Energy Conservation Measures (energy efficiency)
More on Energy & Sustainability
  • Connectivity & Cloud Services
    Connectivity & Cloud Services
  • HVAC System Management
    HVAC System Management
  • HVAC System Repair
    HVAC System Repair
  • Rental
    Rental
More on Operate, Maintain & Repair
  • Building Systems
    Building Systems
  • HVAC System Retrofits
    HVAC System Retrofits
  • HVAC Equipment Upgrades
    HVAC Equipment Upgrades
  • Financing  & Energy Services Contracting
    Financing & Energy Services Contracting
  • Indoor Air Quality Assessment
    Indoor Air Quality Assessment
  • Ready for now.
    Ready for now
More on Upgrade & Modernize
  • VRF & Ductless Solutions
  • Chillers
  • Packaged Units & Split Systems
  • Energy Management & Controls
  • Air Handling
  • Energy Storage
  • Precision Cooling
  • Residential Units
  • N-Gen CITY MULTI VRF
    N-Gen CITY MULTI VRF
  • P Series
    P Series
  • Nv Series
    Nv Series
  • VRF System Design
    VRF System Design
More on VRF & Ductless Solutions
  • Water-Cooled Chillers
    Water-Cooled Chillers
  • Air-Cooled Chillers
    Air-Cooled Chillers
  • Cold Gen Scroll Chiller
    Cold Gen Scroll Chillers
More on Chillers
  • Rooftop Units
    Rooftop Units
  • Split Systems
    Split Systems
  • Self-Contained Units
    Self-Contained Units
  • Water Source Heat Pumps
    Water Source Heat Pumps
  • Dedicated Outdoor Air Units
    Dedicated Outdoor Air Units
More on Packaged Units & Split Systems
  • Building Management Systems
    Building Management Systems
  • Building Automation Systems
    Building Automation Systems
  • Trane® Air-Fi™ Wireless Systems
    Trane® Air-Fi™ Wireless Systems
  • Controllers
    Controllers
  • Thermostats
    Thermostats
  • Accessories
    Accessories
More on Energy Management & Controls
  • Terminal units
    Terminals
  • Sensible-Cooling Terminal Unit
    Sensible-Cooling Terminal Unit
  • VAV Units
    VAV (Variable Air Volume) Units
  • perf-CSAA
    Performance Air Handlers
  • Air Handling Accessories & Controls
    Air Handling Accessories & Controls
More on Air Handling
  • Energy Storage Systems
    Energy Storage Systems
More on Energy Storage
  • Precision Cooling
More on Precision Cooling
Read Customer Story

Creating a comfortable and inviting atmosphere for 1177 West Hastings

Higher Education K-12 Restaurants Healthcare Hospitality Industrial
Indoor Agriculture Data Centers Commercial Real Estate Local Government
Read Blog Post

4 Questions to Determine Your Equipment Upgrade Strategy

About Us Customer Stories
Contact Us

CONTACT A TRANE EXPERT

Puerto Rico Sales & Service Office

Customer Stories

SSM St. Clare Health Center

High satisfaction ranking, energy use 25 percent below projections • Fenton, Missouri

SSM St. Clare Health Center is the first new hospital in St. Louis County in thirty-five years. A hospital like no other, the facility incorporates streamlined work processes, efficient layouts, private patient suites, in-room medication distribution and electronic records.

Challenge

When SSM Health Care announced plans to build SSM St. Clare Health Center to replace its aging St. Joseph Hospital of Kirkwood, it also unveiled a bold vision for the facility. Its goal was to achieve breakthrough results in satisfaction, patient safety, clinical outcomes and operating performance.

A healing environment that inspires confidence
SSM Health Care sought to create the ideal healing environment that would inspire the confidence of patients, as well as provide the best experience for its staff and physicians. Adopting the Institute of Medicine’s "Six Aims" for improving the quality of health care, SSM’s guiding principles were to build a facility that was patient centered,efficient, safe, effective, timely and equitable. Other key objectives were to increase market share and to adhere to tight budgetary compliance.

Solution

Offering a single source for HVAC equipment, controls and services, Trane helped meet lean construction requirements. The Trane offering included a project manager, who was assigned prior to project start up. It was the project manager’s responsibility to plan, direct, oversee and monitor all activities performed by the Trane team, as well as act as the point of contact for the hospital.

Trane joined with hospital administrators, employees, physicians, patient advocates and architects to create an exceptional healing environment. The team took part in site visits, studied non-health care experiences, employed lean design methodology and reviewed best practices to identify the best solutions to help the hospital achieve its goals.

HVAC designed for energy savings and comfort
Energy efficiency and reduced cost of operation were key considerations for the HVAC equipment. The system was designed to provide the right temperature, humidity and ventilation to keep staff and patients comfortable.

System helps ensure efficient equipment operation
With reliability and safety paramount, a Trane Tracer Summit® building automation system (BAS) with nine building control units and Trane Active Monitoring helps keep an eye on hospital performance. The building operations center boasts a 32-inch system monitor and custom Trane dashboards to provide an easy-to-interpret display of current conditions and energy use. The system ensures the efficient operation of equipment throughout the hospital, including the chiller plant, eleven operating rooms, thirteen negative pressure isolation rooms, three cardiac cath labs, two cooling towers and 360 fire/smoke dampers.

Service agreements maintain optimal performance
Trane Select and Scheduled Service Agreements manage the planning and scheduling of routine service and maintenance. The agreements, along with periodic inspections, keep the systems running within optimal performance ranges.

Results

SSM St. Clare Health Center has achieved its vision of reinventing the health care experience. In less than three months, the hospital reached capacity. Plant operation costs are 16 percent below the all network average and energy usage 25 percent below projections. There have been zero medication errors with harm since opening and more than 200 additional physicians have joined the medical staff.

Recent Press Ganey survey results revealed the following rankings:
• Inpatient "likelihood to recommend:" 94th percentile
• Ambulatory surgery: 96th percentile
• Employee engagement (satisfaction): 94th percentile

 

About SSM St. Clare Health Center

The SSM Health Care system began in 1872 with five religious sisters who journeyed from Germany to St. Louis. Today the system operates twenty hospitals and two nursing homes in four states.

St_Clare_Health_Center-Hero.jpg
  • About Trane
  • Customer Stories
  • Locate a Sales Office
  • Careers
  • Contact Us
  • Environmental Compliance
  • Quality
  • Ethical Business Conduct
  • Supplier Terms
  • Facebook
  • LinkedIn
  • YouTube
  • Instagram

Privacy Policy  |   Terms of Use

Trane Technologies