Skip to content
  • Looking for Parts? Visit Trane Supply
  • Education Plattform

Select Your Language

Selecting a language changes the language and content on the Trane site.

  • United States English
  • Canada English
  • Argentina Spanish
  • Mexico Spanish
  • Brazil Portuguese Spanish
  • Aruba English
  • Bahamas English
  • Belize English
  • Bermuda English
  • Bolivia Spanish
  • Bonaire English
  • Cayman Islands English
  • Chile Spanish
  • Colombia Spanish
  • Costa Rica Spanish
  • Curacao English
  • Dominican Republic Spanish
  • Ecuador Spanish
  • El Salvador Spanish
  • Grenada English
  • Guadeloupe English
  • Guatemala Spanish
  • Guyana English
  • Haiti English
  • Jamaica English
  • Martinique English
  • Netherland Antilles English
  • Nicaragua Spanish
  • Panama Spanish
  • Paraguay Spanish
  • Peru Spanish
  • Puerto Rico Spanish
  • Saint Lucia English
  • St. Vincent & Grenadines English
  • Suriname English
  • Trinidad & Tobago English
  • Venezuela Spanish
  • Armenia English
  • Austria German
  • Belarus Russian
  • Belgium English
  • Croatia English
  • Czech Republic Czech
  • Denmark English
  • Estonia English
  • Finland English
  • France French
  • Georgia English
  • Germany German
  • Greece Greek
  • Hungary Hungarian
  • Israel English
  • Ireland English
  • Italy Italian
  • Kazakhstan Russian
  • Latvia English
  • Lithuania English
  • The Netherlands Dutch
  • Norway English
  • Poland English
  • Portugal Portuguese
  • Romania English
  • Russia Russian
  • Serbia Russian
  • Slovakia Czech
  • Slovenia English
  • Spain Spanish
  • Sweden English
  • Switzerland French German Italian
  • Turkey Turkish
  • Ukraine English
  • United Kingdom English
  • Azerbaijan Русский
  • Tajikistan Русский
  • Uzbekistan Русский
  • Turkmenistan Русский
  • United Arab Emirates English Arabic
  • Qatar English
  • Kuwait English
  • Egypt English
  • Lebanon English Arabic French
  • Iraq English
  • Jordan English
  • Mainland of China 选择语言
  • Korea, Republic of (South Korea) Korean
  • Vietnam Vietnamese
  • India English
  • Australia English
  • Japan Japanese
  • Guam English
  • Thailand Thai
  • Taiwan Traditional Chinese
  • Hong Kong SAR English
  • Indonesia English
  • Malaysia English
  • Philippines English
  • Singapore English
  • New Zealand English
  • Services
    • Services
    • Energy & Sustainability
      • Energy & Sustainability
      • Energy Monitoring & Analysis
      • Energy Supply
      • Active Energy Management
      • Renewable Energy & Distributed Energy Resources
      • Energy Conservation Measures (energy efficiency)
    • Operate, Maintain & Repair
      • Operate, Maintain & Repair
      • Connectivity & Cloud Services
      • HVAC System Management
      • HVAC System Repair
      • Rental
    • Upgrade & Modernize
      • Upgrade & Modernize
      • Building Systems
      • HVAC System Retrofits
      • HVAC Equipment Upgrades
      • Financing & Energy Services Contracting
      • Indoor Air Quality Assessment
      • Ready for now
  • Products
    • Products
    • VRF & Ductless Solutions
      • VRF & Ductless Solutions
      • N-Gen CITY MULTI VRF
      • P Series
      • Nv Series
      • VRF System Design
    • Chillers
      • Chillers
      • Water-Cooled Chillers
      • Air-Cooled Chillers
      • Cold Gen Scroll Chillers
    • Packaged Units & Split Systems
      • Packaged Units & Split Systems
      • Rooftop Units
      • Split Systems
      • Self-Contained Units
      • Water Source Heat Pumps
      • Dedicated Outdoor Air Units
    • Energy Management & Controls
      • Energy Management & Controls
      • Building Management Systems
      • Building Automation Systems
      • Trane® Air-Fi™ Wireless Systems
      • Controllers
      • Thermostats
      • Accessories
    • Air Handling
      • Air Handling
      • Terminals
      • Sensible-Cooling Terminal Unit
      • VAV (Variable Air Volume) Units
      • Performance Air Handlers
      • Air Handling Accessories & Controls
    • Energy Storage
      • Energy Storage
      • Energy Storage Systems
    • Precision Cooling
      • Precision Cooling
      • Precision Cooling
    • Residential Units
  • Industries
    • Industries
    • Higher Education
    • Indoor Agriculture
    • K-12
    • Data Centers
    • Restaurants
    • Commercial Real Estate
    • Healthcare
    • Local Government
    • Hospitality
      • Hospitality
    • Industrial
  • About
    • About
    • About Us
    • Contact Us
    • Customer Stories
    • Looking for Parts? Visit Trane Supply
    • Education Plattform
    • North America
      • North America

      • United States English
      • Canada English
    • Latin America
      • Latin America

      • Argentina Spanish
      • Mexico Spanish
      • Brazil Portuguese Spanish
      • Aruba English
      • Bahamas English
      • Belize English
      • Bermuda English
      • Bolivia Spanish
      • Bonaire English
      • Cayman Islands English
      • Chile Spanish
      • Colombia Spanish
      • Costa Rica Spanish
      • Curacao English
      • Dominican Republic Spanish
      • Ecuador Spanish
      • El Salvador Spanish
      • Grenada English
      • Guadeloupe English
      • Guatemala Spanish
      • Guyana English
      • Haiti English
      • Jamaica English
      • Martinique English
      • Netherland Antilles English
      • Nicaragua Spanish
      • Panama Spanish
      • Paraguay Spanish
      • Peru Spanish
      • Puerto Rico Spanish
      • Saint Lucia English
      • St. Vincent & Grenadines English
      • Suriname English
      • Trinidad & Tobago English
      • Venezuela Spanish
    • Europe
      • Europe

      • Armenia English
      • Austria German
      • Belarus Russian
      • Belgium English
      • Croatia English
      • Czech Republic Czech
      • Denmark English
      • Estonia English
      • Finland English
      • France French
      • Georgia English
      • Germany German
      • Greece Greek
      • Hungary Hungarian
      • Israel English
      • Ireland English
      • Italy Italian
      • Kazakhstan Russian
      • Latvia English
      • Lithuania English
      • The Netherlands Dutch
      • Norway English
      • Poland English
      • Portugal Portuguese
      • Romania English
      • Russia Russian
      • Serbia Russian
      • Slovakia Czech
      • Slovenia English
      • Spain Spanish
      • Sweden English
      • Switzerland French German Italian
      • Turkey Turkish
      • Ukraine English
      • United Kingdom English
      • Azerbaijan Русский
      • Tajikistan Русский
      • Uzbekistan Русский
      • Turkmenistan Русский
    • Middle East
      • Middle East

      • United Arab Emirates English Arabic
      • Qatar English
      • Kuwait English
      • Egypt English
      • Lebanon English Arabic French
      • Iraq English
      • Jordan English
    • Asia Pacific
      • Asia Pacific

      • Mainland of China 选择语言
      • Korea, Republic of (South Korea) Korean
      • Vietnam Vietnamese
      • India English
      • Australia English
      • Japan Japanese
      • Guam English
      • Thailand Thai
      • Taiwan Traditional Chinese
      • Hong Kong SAR English
      • Indonesia English
      • Malaysia English
      • Philippines English
      • Singapore English
      • New Zealand English
  • Energy & Sustainability
  • Operate, Maintain & Repair
  • Upgrade & Modernize
  • Energy Monitoring & Analysis
    Energy Monitoring & Analysis
  • Energy Supply
    Energy Supply
  • Active Energy Management
    Active Energy Management
  • Renewable Energy & Distributed Energy Resources
    Renewable Energy & Distributed Energy Resources
  • Energy Conservation Measures (energy efficiency)
    Energy Conservation Measures (energy efficiency)
More on Energy & Sustainability
  • Connectivity & Cloud Services
    Connectivity & Cloud Services
  • HVAC System Management
    HVAC System Management
  • HVAC System Repair
    HVAC System Repair
  • Rental
    Rental
More on Operate, Maintain & Repair
  • Building Systems
    Building Systems
  • HVAC System Retrofits
    HVAC System Retrofits
  • HVAC Equipment Upgrades
    HVAC Equipment Upgrades
  • Financing  & Energy Services Contracting
    Financing & Energy Services Contracting
  • Indoor Air Quality Assessment
    Indoor Air Quality Assessment
  • Ready for now.
    Ready for now
More on Upgrade & Modernize
  • VRF & Ductless Solutions
  • Chillers
  • Packaged Units & Split Systems
  • Energy Management & Controls
  • Air Handling
  • Energy Storage
  • Precision Cooling
  • Residential Units
  • N-Gen CITY MULTI VRF
    N-Gen CITY MULTI VRF
  • P Series
    P Series
  • Nv Series
    Nv Series
  • VRF System Design
    VRF System Design
More on VRF & Ductless Solutions
  • Water-Cooled Chillers
    Water-Cooled Chillers
  • Air-Cooled Chillers
    Air-Cooled Chillers
  • Cold Gen Scroll Chiller
    Cold Gen Scroll Chillers
More on Chillers
  • Rooftop Units
    Rooftop Units
  • Split Systems
    Split Systems
  • Self-Contained Units
    Self-Contained Units
  • Water Source Heat Pumps
    Water Source Heat Pumps
  • Dedicated Outdoor Air Units
    Dedicated Outdoor Air Units
More on Packaged Units & Split Systems
  • Building Management Systems
    Building Management Systems
  • Building Automation Systems
    Building Automation Systems
  • Trane® Air-Fi™ Wireless Systems
    Trane® Air-Fi™ Wireless Systems
  • Controllers
    Controllers
  • Thermostats
    Thermostats
  • Accessories
    Accessories
More on Energy Management & Controls
  • Terminal units
    Terminals
  • Sensible-Cooling Terminal Unit
    Sensible-Cooling Terminal Unit
  • VAV Units
    VAV (Variable Air Volume) Units
  • perf-CSAA
    Performance Air Handlers
  • Air Handling Accessories & Controls
    Air Handling Accessories & Controls
More on Air Handling
  • Energy Storage Systems
    Energy Storage Systems
More on Energy Storage
  • Precision Cooling
More on Precision Cooling
Read Customer Story

Creating a comfortable and inviting atmosphere for 1177 West Hastings

Higher Education K-12 Restaurants Healthcare Hospitality Industrial
Indoor Agriculture Data Centers Commercial Real Estate Local Government
Read Blog Post

4 Questions to Determine Your Equipment Upgrade Strategy

About Us Customer Stories
Contact Us

CONTACT A TRANE EXPERT

Puerto Rico Sales & Service Office
City of Sultan - hero.jpg

Customer Stories

City of Sultan

City of Sultan - hero.jpg

Challenge

Established in the late 1880’s, the City of Sultan has a rich heritage as a logging, mining and agricultural community. To accommodate a growing population, City administrators knew infrastructure upgrades at its Wastewater Treatment Plant  were needed. In addition, its Booster Pump Station, which serves potable water to City residents and fire system, as well as backwash to the potable water treatment facility, was not able to maintain system pressure during peak flow events, its electrical generator was undersized, and the building itself was at the end of its useful life. The City initiated two projects, the first to upgrade its Wastewater Treatment Plant, followed by upgrades to resolve the issues at its Booster Pump Station.

Key objectives: Wastewater Treatment Plant
The City’s key objectives for its Wastewater Treatment Plant were to avoid capital costs that would be required to maintain its aging infrastructure, to reduce energy costs by using more efficient equipment and improving processes, and to maximize operational efficiencies. The City also wished to upgrade its controls system for the benefit of plant operators, and improve exterior lighting quality and safety.

Key objectives: Booster Pump Station
The City also sought to avoid costs associated with maintaining the antiquated equipment at its Booster Pump Station. For the continued health and safety of its residents, the City wanted a redundant potable water system that would ensure the facility maintained code requirements and reduced the risk of system failure. In addition, the City wished to increase capacity to help meet peak demand, reduce energy costs and extend the life of its systems.

Solution

Project I: Wastewater Treatment Plant
After working with Trane to complete a city-wide Preliminary Audit, the City selected the company to implement an Investment Grade Audit (IGA) of its Wastewater Treatment Plant through the State of Washington Energy Savings Performance Contracting (ESPC) program administered by the Department of Enterprise Services. During the IGA, Trane identified opportunities to improve the treatment process and increase energy efficiency. Trane presented a solution that maximized grant and utility incentive dollars, improved system operation and addressed capital improvement needs. IGA data was used to prioritize proposed energy conservation measures (ECMs) and used to project energy savings to assist in obtaining grant dollars from the Department of Commerce and energy conservation incentives from Snohomish PUD to enable the project.

Maximizing energy and process efficiency
A dissolved oxygen (DO) sensor was installed in the oxidation ditch and integrated into the plant’s SCADA system to provide operators with accurate DO levels. Programmable logic controller (PLC) programming was completed to automatically control mixer and aerator speed to maintain a constant DO  level in accordance with demands of the biological process.  By allowing operators to set two anoxic cycles per day instead of one, the programming changes will enhance present and future operations. It maximizes energy and process efficiency, while providing aeration to meet required levels and mixing in oxidation ditches. The heat pump was replaced with a new pump correctly sized for present and future operations.  Twenty-three yard lights and wall packs were replaced with LED fixtures, and five fluorescent fixtures were retrofit with T-8 lamps and electronic ballasts to improve exterior lighting quality and safety, while maximizing energy efficiency.

Project II: Booster Pump Station
Trane began with an Investment Grade Audit (IGA) to identify and prioritize ECMs for implementation. The project consisted of process and efficiency improvements to increase peak capacity and system reliability, replace aging equipment and generate energy/operational savings. Five booster pumps were installed to replace end of life equipment, and an abovegrade metal building was constructed to improve the potable
water system infrastructure and increase capacity to meet current peak demand conditions. To further increase capacity and provide redundancy, an emergency generator was added adjacent to the building. The improvements help maximize energy efficiency while meeting water demands of two zones, and supplement flows required during a fire event. The SCADA system was expanded to improve flow monitoring and alarming, and aesthetic improvements were implemented.

Results

City of Sultan Wastewater Treatment Plant and Booster Pump Station upgrades are helping to ensure the continued health and safety of area residents and accommodate the needs of a growing population. Results include:

Wastewater Treatment Plant

  • Utility cost savings of more than $7,700/yr, with annual
    reduction in energy use of more than 92,000 kWh.
  • Snohomish PUD incentives estimated at more than $16,000
    and Department of Commerce grants of nearly $196,600.
  • Capital replacement cost avoidance of more than $84,000.

Booster Pump Station

  • Utility cost savings of more than $2,700/yr, with stipulated
    energy use reduction of 30,786 kWh/yr.
  • Snohomish PUD utility incentives estimated at $6,800.
  • Maintenance and operational cost reductions estimated at
    $12,500/yr for three years.

 

 

 

Trane and the Circle Logo are trademarks of Trane in the United States and other countries. 

 

  • About Trane
  • Customer Stories
  • Locate a Sales Office
  • Careers
  • Contact Us
  • Environmental Compliance
  • Quality
  • Ethical Business Conduct
  • Supplier Terms
  • Facebook
  • LinkedIn
  • YouTube
  • Instagram

Privacy Policy  |   Terms of Use

Trane Technologies