Skip to content
  • Looking for Parts? Visit Trane Supply
  • Education Plattform

Select Your Language

Selecting a language changes the language and content on the Trane site.

  • United States English
  • Canada English
  • Argentina Spanish
  • Mexico Spanish
  • Brazil Portuguese Spanish
  • Aruba English
  • Bahamas English
  • Belize English
  • Bermuda English
  • Bolivia Spanish
  • Bonaire English
  • Cayman Islands English
  • Chile Spanish
  • Colombia Spanish
  • Costa Rica Spanish
  • Curacao English
  • Dominican Republic Spanish
  • Ecuador Spanish
  • El Salvador Spanish
  • Grenada English
  • Guadeloupe English
  • Guatemala Spanish
  • Guyana English
  • Haiti English
  • Jamaica English
  • Martinique English
  • Netherland Antilles English
  • Nicaragua Spanish
  • Panama Spanish
  • Paraguay Spanish
  • Peru Spanish
  • Puerto Rico Spanish
  • Saint Lucia English
  • St. Vincent & Grenadines English
  • Suriname English
  • Trinidad & Tobago English
  • Venezuela Spanish
  • Armenia English
  • Austria German
  • Belarus Russian
  • Belgium English
  • Croatia English
  • Czech Republic Czech
  • Denmark English
  • Estonia English
  • Finland English
  • France French
  • Georgia English
  • Germany German
  • Greece Greek
  • Hungary Hungarian
  • Israel English
  • Ireland English
  • Italy Italian
  • Kazakhstan Russian
  • Latvia English
  • Lithuania English
  • The Netherlands Dutch
  • Norway English
  • Poland English
  • Portugal Portuguese
  • Romania English
  • Russia Russian
  • Serbia Russian
  • Slovakia Czech
  • Slovenia English
  • Spain Spanish
  • Sweden English
  • Switzerland French German Italian
  • Turkey Turkish
  • Ukraine English
  • United Kingdom English
  • Azerbaijan Русский
  • Tajikistan Русский
  • Uzbekistan Русский
  • Turkmenistan Русский
  • United Arab Emirates English Arabic
  • Qatar English
  • Kuwait English
  • Egypt English
  • Lebanon English Arabic French
  • Iraq English
  • Jordan English
  • Mainland of China 选择语言
  • Korea, Republic of (South Korea) Korean
  • Vietnam Vietnamese
  • India English
  • Australia English
  • Japan Japanese
  • Guam English
  • Thailand Thai
  • Taiwan Traditional Chinese
  • Hong Kong SAR English
  • Indonesia English
  • Malaysia English
  • Philippines English
  • Singapore English
  • New Zealand English
  • Services
    • Services
    • Energy & Sustainability
      • Energy & Sustainability
      • Energy Monitoring & Analysis
      • Energy Supply
      • Active Energy Management
      • Renewable Energy & Distributed Energy Resources
      • Energy Conservation Measures (energy efficiency)
    • Operate, Maintain & Repair
      • Operate, Maintain & Repair
      • Connectivity & Cloud Services
      • HVAC System Management
      • HVAC System Repair
      • Rental
    • Upgrade & Modernize
      • Upgrade & Modernize
      • Building Systems
      • HVAC System Retrofits
      • HVAC Equipment Upgrades
      • Financing & Energy Services Contracting
      • Indoor Air Quality Assessment
      • Ready for now
  • Products
    • Products
    • VRF & Ductless Solutions
      • VRF & Ductless Solutions
      • N-Gen CITY MULTI VRF
      • P Series
      • Nv Series
      • VRF System Design
    • Chillers
      • Chillers
      • Water-Cooled Chillers
      • Air-Cooled Chillers
      • Cold Gen Scroll Chillers
    • Packaged Units & Split Systems
      • Packaged Units & Split Systems
      • Rooftop Units
      • Split Systems
      • Self-Contained Units
      • Water Source Heat Pumps
      • Dedicated Outdoor Air Units
    • Energy Management & Controls
      • Energy Management & Controls
      • Building Management Systems
      • Building Automation Systems
      • Trane® Air-Fi™ Wireless Systems
      • Controllers
      • Thermostats
      • Accessories
    • Air Handling
      • Air Handling
      • Terminals
      • Sensible-Cooling Terminal Unit
      • VAV (Variable Air Volume) Units
      • Performance Air Handlers
      • Air Handling Accessories & Controls
    • Energy Storage
      • Energy Storage
      • Energy Storage Systems
    • Precision Cooling
      • Precision Cooling
      • Precision Cooling
    • Residential Units
  • Industries
    • Industries
    • Higher Education
    • Indoor Agriculture
    • K-12
    • Data Centers
    • Restaurants
    • Commercial Real Estate
    • Healthcare
    • Local Government
    • Hospitality
      • Hospitality
    • Industrial
  • About
    • About
    • About Us
    • Contact Us
    • Customer Stories
    • Looking for Parts? Visit Trane Supply
    • Education Plattform
    • North America
      • North America

      • United States English
      • Canada English
    • Latin America
      • Latin America

      • Argentina Spanish
      • Mexico Spanish
      • Brazil Portuguese Spanish
      • Aruba English
      • Bahamas English
      • Belize English
      • Bermuda English
      • Bolivia Spanish
      • Bonaire English
      • Cayman Islands English
      • Chile Spanish
      • Colombia Spanish
      • Costa Rica Spanish
      • Curacao English
      • Dominican Republic Spanish
      • Ecuador Spanish
      • El Salvador Spanish
      • Grenada English
      • Guadeloupe English
      • Guatemala Spanish
      • Guyana English
      • Haiti English
      • Jamaica English
      • Martinique English
      • Netherland Antilles English
      • Nicaragua Spanish
      • Panama Spanish
      • Paraguay Spanish
      • Peru Spanish
      • Puerto Rico Spanish
      • Saint Lucia English
      • St. Vincent & Grenadines English
      • Suriname English
      • Trinidad & Tobago English
      • Venezuela Spanish
    • Europe
      • Europe

      • Armenia English
      • Austria German
      • Belarus Russian
      • Belgium English
      • Croatia English
      • Czech Republic Czech
      • Denmark English
      • Estonia English
      • Finland English
      • France French
      • Georgia English
      • Germany German
      • Greece Greek
      • Hungary Hungarian
      • Israel English
      • Ireland English
      • Italy Italian
      • Kazakhstan Russian
      • Latvia English
      • Lithuania English
      • The Netherlands Dutch
      • Norway English
      • Poland English
      • Portugal Portuguese
      • Romania English
      • Russia Russian
      • Serbia Russian
      • Slovakia Czech
      • Slovenia English
      • Spain Spanish
      • Sweden English
      • Switzerland French German Italian
      • Turkey Turkish
      • Ukraine English
      • United Kingdom English
      • Azerbaijan Русский
      • Tajikistan Русский
      • Uzbekistan Русский
      • Turkmenistan Русский
    • Middle East
      • Middle East

      • United Arab Emirates English Arabic
      • Qatar English
      • Kuwait English
      • Egypt English
      • Lebanon English Arabic French
      • Iraq English
      • Jordan English
    • Asia Pacific
      • Asia Pacific

      • Mainland of China 选择语言
      • Korea, Republic of (South Korea) Korean
      • Vietnam Vietnamese
      • India English
      • Australia English
      • Japan Japanese
      • Guam English
      • Thailand Thai
      • Taiwan Traditional Chinese
      • Hong Kong SAR English
      • Indonesia English
      • Malaysia English
      • Philippines English
      • Singapore English
      • New Zealand English
  • Energy & Sustainability
  • Operate, Maintain & Repair
  • Upgrade & Modernize
  • Energy Monitoring & Analysis
    Energy Monitoring & Analysis
  • Energy Supply
    Energy Supply
  • Active Energy Management
    Active Energy Management
  • Renewable Energy & Distributed Energy Resources
    Renewable Energy & Distributed Energy Resources
  • Energy Conservation Measures (energy efficiency)
    Energy Conservation Measures (energy efficiency)
More on Energy & Sustainability
  • Connectivity & Cloud Services
    Connectivity & Cloud Services
  • HVAC System Management
    HVAC System Management
  • HVAC System Repair
    HVAC System Repair
  • Rental
    Rental
More on Operate, Maintain & Repair
  • Building Systems
    Building Systems
  • HVAC System Retrofits
    HVAC System Retrofits
  • HVAC Equipment Upgrades
    HVAC Equipment Upgrades
  • Financing  & Energy Services Contracting
    Financing & Energy Services Contracting
  • Indoor Air Quality Assessment
    Indoor Air Quality Assessment
  • Ready for now.
    Ready for now
More on Upgrade & Modernize
  • VRF & Ductless Solutions
  • Chillers
  • Packaged Units & Split Systems
  • Energy Management & Controls
  • Air Handling
  • Energy Storage
  • Precision Cooling
  • Residential Units
  • N-Gen CITY MULTI VRF
    N-Gen CITY MULTI VRF
  • P Series
    P Series
  • Nv Series
    Nv Series
  • VRF System Design
    VRF System Design
More on VRF & Ductless Solutions
  • Water-Cooled Chillers
    Water-Cooled Chillers
  • Air-Cooled Chillers
    Air-Cooled Chillers
  • Cold Gen Scroll Chiller
    Cold Gen Scroll Chillers
More on Chillers
  • Rooftop Units
    Rooftop Units
  • Split Systems
    Split Systems
  • Self-Contained Units
    Self-Contained Units
  • Water Source Heat Pumps
    Water Source Heat Pumps
  • Dedicated Outdoor Air Units
    Dedicated Outdoor Air Units
More on Packaged Units & Split Systems
  • Building Management Systems
    Building Management Systems
  • Building Automation Systems
    Building Automation Systems
  • Trane® Air-Fi™ Wireless Systems
    Trane® Air-Fi™ Wireless Systems
  • Controllers
    Controllers
  • Thermostats
    Thermostats
  • Accessories
    Accessories
More on Energy Management & Controls
  • Terminal units
    Terminals
  • Sensible-Cooling Terminal Unit
    Sensible-Cooling Terminal Unit
  • VAV Units
    VAV (Variable Air Volume) Units
  • perf-CSAA
    Performance Air Handlers
  • Air Handling Accessories & Controls
    Air Handling Accessories & Controls
More on Air Handling
  • Energy Storage Systems
    Energy Storage Systems
More on Energy Storage
  • Precision Cooling
More on Precision Cooling
Read Customer Story

Creating a comfortable and inviting atmosphere for 1177 West Hastings

Higher Education K-12 Restaurants Healthcare Hospitality Industrial
Indoor Agriculture Data Centers Commercial Real Estate Local Government
Read Blog Post

4 Questions to Determine Your Equipment Upgrade Strategy

About Us Customer Stories
Contact Us

CONTACT A TRANE EXPERT

Puerto Rico Sales & Service Office

Organizing a Critical Systems Contingency Plan

July 27, 2017

Organizing A Critical Systems Contingency Plan

From natural disasters to everyday mechanical failures, all facilities face some level of risk due to power, HVAC or compressed air failure. A failure could result in anything from minor discomfort due to lack of temperature control to losing hundreds of thousands of dollars due to lost productivity. Knowing everything that you have at risk can help you decide the level of planning that is warranted.

Developing a critical systems contingency plan helps you determine the financial risks associated with losing control of your indoor environment and which types of outages present the highest risk.

Benefits of a Critical Systems Contingency Plan

Having a critical systems contingency plan, allows facility managers and business owners to gain control and have peace of mind knowing that their facility can withstand any disaster and be back up and running quickly. A good contingency plan delivers these major benefits:

  • Shortening the time needed to acquire, install and start up temporary power at your facility.
  • Ensuring that all parties dealing with the outage are aware of their roles and are trained in the processes and actions needed to deal with the problem.
  • Lowering the total cost of the temporary solutions because any necessary building modifications are scheduled ahead of time.
  • Reducing startup delays caused by oversights resulting from improvised designs.
  • Improving a facility’s operations by identifying and reducing weaknesses in the system.

 

Click me

Organizing Your Critical Systems Contingency Plan

With the goal of not interrupting your daily operations, organize a quick and efficient critical systems contingency plan by reviewing and documenting these key items:

  1. Financial Risk Analysis: Review the different functional areas of your facility, their dependence on power, HVAC and compressed air equipment, and the impact a loss could potentially have. Understanding the importance of these items and quantifying their financial impact determines the areas of focus.
  2. Risk Assessment: Identify the potential causes for an interruption and rank them based on cost impact, probability of occurrence and system downtime.
  3. Equipment Identification: Document all equipment in your HVAC, compressed air and power systems, including their operating conditions. This process can uncover system weaknesses that need to be addressed before implementation of the plan.
  4. Prioritization: Evaluate your most critical facility loads and process needs for essential operations, including those with the highest financial implications for your business. At this point, you may want to consider load prioritization and/or load shedding to reduce the amount of capacity required.
  5. System Connection: How and where connections are made helps reduce time and money. Choose a location that is easily accessible and that requires the least amount of temporary installation material to keep additional costs to a minimum.
  6. Power Availability: Document the available voltage(s) and amperage. This is vital because a transformer or generator may be required. Even if your power has not been affected, some temporary units may require more power than your existing units.
  7. Electrical Connection: Whether existing electrical service is adequate or new electrical service will be installed, we will establish the location of the temporary electrical connection(s) and how they will be made.
  8. Temporary Equipment Location: Equipment location is important for determining how much electrical cable, chilled water hose and/or flex duct is required. Consider safety of the public and personnel, security, ease of placement, equipment clearances, structural loads, ground firmness and level, noise, emissions (generator), public visibility, auto and pedestrian traffic, permits to minimize impact on normal operations.
  9. Plan Creation: Document your plan including recommended temporary equipment solutions, the total investment required (both capital and expense), budgetary figures for the temporary solutions (including first and recurring costs), and detailed roles and responsibilities for internal and external resources.
  10. Implement and Review: To expedite the ordering and delivery of a temporary system in an emergency situation, make sure that all documents (purchase orders, rental agreements) are completed, and all recommended building modifications are made. Review your plan at least once a year, or when any facility changes are made.

Plan for protecting your commercial HVAC system

Trane Rental Services group uses this same industry-leading expertise in developing temporary solutions. These temporary solutions can make all the difference if your facility ever experiences an unexpected loss of power, heating, ventilating, and air conditioning (HVAC) or compressed air capabilities.

From providing a safe and comfortable work environment to ensuring your equipment stays in working condition, we work with you to prepare your facility to get power, HVAC and compressed air equipment back up and running fast.

Ready to create a commercial air conditioning contingency plan?

Contact the Trane Rental Services Team at 1-800-755-5115 or your local Trane office for additional information on critical systems contingency plans and rental services.

Looking For Parts?

Visit Trane Supply

For General and Corporate Questions:

Contact Us
  • About Trane
  • Customer Stories
  • Locate a Sales Office
  • Careers
  • Contact Us
  • Environmental Compliance
  • Quality
  • Ethical Business Conduct
  • Supplier Terms
  • Facebook
  • LinkedIn
  • YouTube
  • Instagram

Privacy Policy  |   Terms of Use

Trane Technologies