Skip to content
Select Your Language

Selecting a language changes the language and content on the Trane site.

  • United States English
  • Canada English
  • Argentina Spanish
  • Mexico Spanish
  • Brazil Portuguese Spanish
  • Aruba English
  • Bahamas English
  • Belize English
  • Bermuda English
  • Bolivia Spanish
  • Bonaire English
  • Cayman Islands English
  • Chile Spanish
  • Colombia Spanish
  • Costa Rica Spanish
  • Curacao English
  • Dominican Republic Spanish
  • Ecuador Spanish
  • El Salvador Spanish
  • Grenada English
  • Guadeloupe English
  • Guatemala Spanish
  • Guyana English
  • Haiti English
  • Jamaica English
  • Martinique English
  • Netherland Antilles English
  • Nicaragua Spanish
  • Panama Spanish
  • Paraguay Spanish
  • Peru Spanish
  • Puerto Rico Spanish
  • Saint Lucia English
  • St. Vincent & Grenadines English
  • Suriname English
  • Trinidad & Tobago English
  • Venezuela Spanish
  • Armenia English
  • Austria German
  • Belarus Russian
  • Belgium English
  • Croatia English
  • Czech Republic Czech
  • Denmark English
  • Estonia English
  • Finland English
  • France French
  • Georgia English
  • Germany German
  • Greece Greek
  • Hungary Hungarian
  • Israel English
  • Ireland English
  • Italy Italian
  • Kazakhstan Russian
  • Latvia English
  • Lithuania English
  • The Netherlands Dutch
  • Norway English
  • Poland English
  • Portugal Portuguese
  • Romania English
  • Russia Russian
  • Serbia Russian
  • Slovakia Czech
  • Slovenia English
  • Spain Spanish
  • Sweden English
  • Switzerland French German Italian
  • Turkey Turkish
  • Ukraine English
  • United Kingdom English
  • Azerbaijan Русский
  • Tajikistan Русский
  • Uzbekistan Русский
  • Turkmenistan Русский
  • United Arab Emirates English Arabic
  • Qatar English
  • Kuwait English
  • Egypt English
  • Lebanon English Arabic French
  • Iraq English
  • Jordan English
  • Mainland of China 选择语言
  • Korea, Republic of (South Korea) Korean
  • Vietnam Vietnamese
  • India English
  • Australia English
  • Japan Japanese
  • Guam English
  • Thailand Thai
  • Taiwan Traditional Chinese
  • Hong Kong SAR English
  • Indonesia English
  • Malaysia English
  • Philippines English
  • Singapore English
  • New Zealand English
  • Services
    • Services
    • Energy & Sustainability
      • Energy & Sustainability
      • Energy Monitoring & Analysis
      • Energy Supply
      • Active Energy Management
      • Renewable Energy & Distributed Energy Resources
      • Energy Conservation Measures (energy efficiency)
    • Operate, Maintain & Repair
      • Operate, Maintain & Repair
      • Connectivity & Cloud Services
      • HVAC System Management
      • HVAC System Repair
      • Rental
    • Upgrade & Modernize
      • Upgrade & Modernize
      • Building Systems
      • HVAC System Retrofits
      • HVAC Equipment Upgrades
      • Financing & Energy Services Contracting
      • Indoor Air Quality Assessment
      • Ready for now
  • Products
    • Products
    • VRF & Ductless Solutions
      • VRF & Ductless Solutions
      • N-Gen CITY MULTI VRF
      • P Series
      • Nv Series
      • VRF System Design
    • Chillers
      • Chillers
      • Water-Cooled Chillers
      • Air-Cooled Chillers
      • Cold Gen Scroll Chillers
    • Packaged Units & Split Systems
      • Packaged Units & Split Systems
      • Rooftop Units
      • Split Systems
      • Self-Contained Units
      • Water Source Heat Pumps
      • Dedicated Outdoor Air Units
    • Energy Management & Controls
      • Energy Management & Controls
      • Building Management Systems
      • Building Automation Systems
      • Trane® Air-Fi™ Wireless Systems
      • Controllers
      • Thermostats
      • Accessories
    • Air Handling
      • Air Handling
      • Terminals
      • Sensible-Cooling Terminal Unit
      • VAV (Variable Air Volume) Units
      • Performance Air Handlers
      • Air Handling Accessories & Controls
    • Energy Storage
      • Energy Storage
      • Energy Storage Systems
    • Precision Cooling
      • Precision Cooling
      • Precision Cooling
    • Residential Units
  • Industries
    • Industries
    • Higher Education
    • Indoor Agriculture
    • K-12
    • Data Centers
    • Restaurants
    • Commercial Real Estate
    • Healthcare
    • Local Government
    • Hospitality
      • Hospitality
    • Industrial
  • About
    • About
    • About Us
    • Contact Us
    • Customer Stories
    • Looking for Parts? Visit Trane Supply
    • Education Plattform
    • North America
      • North America

      • United States English
      • Canada English
    • Latin America
      • Latin America

      • Argentina Spanish
      • Mexico Spanish
      • Brazil Portuguese Spanish
      • Aruba English
      • Bahamas English
      • Belize English
      • Bermuda English
      • Bolivia Spanish
      • Bonaire English
      • Cayman Islands English
      • Chile Spanish
      • Colombia Spanish
      • Costa Rica Spanish
      • Curacao English
      • Dominican Republic Spanish
      • Ecuador Spanish
      • El Salvador Spanish
      • Grenada English
      • Guadeloupe English
      • Guatemala Spanish
      • Guyana English
      • Haiti English
      • Jamaica English
      • Martinique English
      • Netherland Antilles English
      • Nicaragua Spanish
      • Panama Spanish
      • Paraguay Spanish
      • Peru Spanish
      • Puerto Rico Spanish
      • Saint Lucia English
      • St. Vincent & Grenadines English
      • Suriname English
      • Trinidad & Tobago English
      • Venezuela Spanish
    • Europe
      • Europe

      • Armenia English
      • Austria German
      • Belarus Russian
      • Belgium English
      • Croatia English
      • Czech Republic Czech
      • Denmark English
      • Estonia English
      • Finland English
      • France French
      • Georgia English
      • Germany German
      • Greece Greek
      • Hungary Hungarian
      • Israel English
      • Ireland English
      • Italy Italian
      • Kazakhstan Russian
      • Latvia English
      • Lithuania English
      • The Netherlands Dutch
      • Norway English
      • Poland English
      • Portugal Portuguese
      • Romania English
      • Russia Russian
      • Serbia Russian
      • Slovakia Czech
      • Slovenia English
      • Spain Spanish
      • Sweden English
      • Switzerland French German Italian
      • Turkey Turkish
      • Ukraine English
      • United Kingdom English
      • Azerbaijan Русский
      • Tajikistan Русский
      • Uzbekistan Русский
      • Turkmenistan Русский
    • Middle East
      • Middle East

      • United Arab Emirates English Arabic
      • Qatar English
      • Kuwait English
      • Egypt English
      • Lebanon English Arabic French
      • Iraq English
      • Jordan English
    • Asia Pacific
      • Asia Pacific

      • Mainland of China 选择语言
      • Korea, Republic of (South Korea) Korean
      • Vietnam Vietnamese
      • India English
      • Australia English
      • Japan Japanese
      • Guam English
      • Thailand Thai
      • Taiwan Traditional Chinese
      • Hong Kong SAR English
      • Indonesia English
      • Malaysia English
      • Philippines English
      • Singapore English
      • New Zealand English
  • Energy & Sustainability
  • Energy Monitoring & Analysis
  • Energy Supply
  • Active Energy Management
  • Renewable Energy & Distributed Energy Resources
  • Energy Conservation Measures (energy efficiency)
  • Operate, Maintain & Repair
  • Connectivity & Cloud Services
  • HVAC System Management
  • HVAC System Repair
  • Rental
  • Upgrade & Modernize
  • Building Systems
  • HVAC System Retrofits
  • HVAC Equipment Upgrades
  • Financing & Energy Services Contracting
  • Indoor Air Quality Assessment
  • Ready for now
  • VRF & Ductless Solutions
  • N-Gen CITY MULTI VRF
  • P Series
  • Nv Series
  • VRF System Design
  • Chillers
  • Water-Cooled Chillers
  • Air-Cooled Chillers
  • Cold Gen Scroll Chillers
  • Packaged Units & Split Systems
  • Rooftop Units
  • Split Systems
  • Self-Contained Units
  • Water Source Heat Pumps
  • Dedicated Outdoor Air Units
  • Energy Management & Controls
  • Building Management Systems
  • Building Automation Systems
  • Trane® Air-Fi™ Wireless Systems
  • Controllers
  • Thermostats
  • Accessories
  • Air Handling
  • Terminals
  • Sensible-Cooling Terminal Unit
  • VAV (Variable Air Volume) Units
  • Performance Air Handlers
  • Air Handling Accessories & Controls
  • Energy Storage
  • Energy Storage Systems
  • Precision Cooling
  • Precision Cooling
  • Residential Units
Read Customer Story

Creating a comfortable and inviting atmosphere for 1177 West Hastings

Higher Education K-12 Restaurants Healthcare Hospitality Industrial
Indoor Agriculture Data Centers Commercial Real Estate Local Government
Read Blog Post

4 Questions to Determine Your Equipment Upgrade Strategy

About Us Customer Stories
Contact Us

CONTACT A TRANE EXPERT

Gain Control with these 10 Contingency Planning Steps

June 30, 2016

Businessmen discussing papers

Summer’s extreme temperatures and unpredictable severe weather can result in equipment or power outages. Being prepared for unexpected building failures can save you valuable time and money during an emergency.

Don’t find yourself searching for a generator as a tropical storm makes its way toward your region. Gain control and peace of mind by following these 10 contingency planning steps.

Financial risk analysis. Review the different functional areas of your facility, their dependence on power, HVAC and compressed air equipment, and the impact a loss could potentially have. By understanding the importance of these items to your operations and quantifying their financial impact, you can determine the areas that need to be considered.

Risk assessment. Identify the potential causes for an interruption and rank them based on cost impact, probability of occurrence and system downtime.

Equipment identification. Document all equipment in your HVAC and power systems, including their operating conditions. This will help uncover system weaknesses that need to be addressed before you implement your plan.

Prioritization. Evaluate your most critical facility loads and process needs for essential operations, including those with the highest financial implications for your business. Consider load prioritization and/or load shedding to reduce the amount of capacity required. For a short period of time, you may be able to operate with higher air temperatures in certain areas and completely shut down others.

System connection. How and where connections are made helps reduce time and money. It is important to choose a location that is easily accessible and requires the least amount of temporary installation material. This will help keep additional costs to a minimum.

Power availability. Document the available voltage(s) and amperage in case a transformer or generator is needed. Even if your power has not been affected, some temporary units may require more power than your existing units.

Electrical connection. Establish the location of the temporary electrical connection(s) and how they will be made.

Temporary equipment location. Equipment location is important for determining how much electrical cable, chilled water hose and/or flex duct will be required.

Plan creation.  Your plan should include recommended temporary equipment solutions, the total investment required, and detailed roles and responsibilities for internal and external resources.

Review. Be sure to review your plan at least once a year, or when facility changes are made.

A Trane account manager is ready to work with you and your facility team to create your building contingency plan. 

Looking For Parts?

Visit Trane Supply

For General and Corporate Questions:

Contact Us
  • About Trane
  • Customer Stories
  • Locate a Sales Office
  • Careers
  • Contact Us
  • Environmental Compliance
  • Quality
  • Ethical Business Conduct
  • Supplier Terms
  • Facebook
  • LinkedIn
  • YouTube
  • Instagram

Privacy Policy  |   Terms of Use

Trane Technologies