Community


The Alchemist Brewery

With a number of wash down and boiling procedures inherent in the beer brewing process, humidity control was a top priority as The Alchemist planned construction of its new Stowe facility. Based on a trusted relationship that spanned seventeen years, VHV contacted Trane to discuss project challenges and the best mix of HVAC equipment and controls to support the operation.

Read More

Brookdale Baptist Church

Lighting upgrades, installation of building automation system, and implementation of demand limiting triage controls strategy result in significant reduction in electricity costs; decrease peak demand by 64 percent.

Read More

Science Museum of Minnesota

Heat recovery retrofit captures and uses waste heat to reduce load; lowers heating bills more than 75 percent; results in savings of nearly $300,000/year with an approx. three-year payback; moves facility toward carbon neutrality; and transforms museum into living lab to carry out its mission.

Read More

Georgia World Congress Center Authority

Energy saving performance contracting upgrades reduce energy use 39 percent, saving more than $2.5 million a year; lower water usage by 17 million gallons annually; result in more than $876,000 in annual operational cost savings and 289 tons of recycled waste; help achieve LEED Gold certification

Read More

Jeptha Creed Distillery

Thermal storage system answers process cooling needs; shifts demand load; results in energy savings of more than $20,000 a year • Shelbyville, Kentucky

Read More