Skip to content
Select Your Language

Selecting a language changes the language and content on the Trane site.

  • United States English
  • Canada English
  • Argentina Spanish
  • Mexico Spanish
  • Brazil Portuguese Spanish
  • Aruba English
  • Bahamas English
  • Belize English
  • Bermuda English
  • Bolivia Spanish
  • Bonaire English
  • Cayman Islands English
  • Chile Spanish
  • Colombia Spanish
  • Costa Rica Spanish
  • Curacao English
  • Dominican Republic Spanish
  • Ecuador Spanish
  • El Salvador Spanish
  • Grenada English
  • Guadeloupe English
  • Guatemala Spanish
  • Guyana English
  • Haiti English
  • Jamaica English
  • Martinique English
  • Netherland Antilles English
  • Nicaragua Spanish
  • Panama Spanish
  • Paraguay Spanish
  • Peru Spanish
  • Puerto Rico Spanish
  • Saint Lucia English
  • St. Vincent & Grenadines English
  • Suriname English
  • Trinidad & Tobago English
  • Venezuela Spanish
  • Armenia English
  • Austria German
  • Belarus Russian
  • Belgium English
  • Croatia English
  • Czech Republic Czech
  • Denmark English
  • Estonia English
  • Finland English
  • France French
  • Georgia English
  • Germany German
  • Greece Greek
  • Hungary Hungarian
  • Israel English
  • Ireland English
  • Italy Italian
  • Kazakhstan Russian
  • Latvia English
  • Lithuania English
  • The Netherlands Dutch
  • Norway English
  • Poland English
  • Portugal Portuguese
  • Romania English
  • Russia Russian
  • Serbia Russian
  • Slovakia Czech
  • Slovenia English
  • Spain Spanish
  • Sweden English
  • Switzerland French German Italian
  • Turkey Turkish
  • Ukraine English
  • United Kingdom English
  • Azerbaijan Русский
  • Tajikistan Русский
  • Uzbekistan Русский
  • Turkmenistan Русский
  • United Arab Emirates English Arabic
  • Qatar English
  • Kuwait English
  • Egypt English
  • Lebanon English Arabic French
  • Iraq English
  • Jordan English
  • Mainland of China 选择语言
  • Korea, Republic of (South Korea) Korean
  • Vietnam Vietnamese
  • India English
  • Australia English
  • Japan Japanese
  • Guam English
  • Thailand Thai
  • Taiwan Traditional Chinese
  • Hong Kong SAR English
  • Indonesia English
  • Malaysia English
  • Philippines English
  • Singapore English
  • New Zealand English

CONTACT A TRANE EXPERT

TRANE Guyana
    • Looking for Parts? Visit Trane Supply
    • North America
      • North America

      • United States English
      • Canada English
    • Latin America
      • Latin America

      • Argentina Spanish
      • Mexico Spanish
      • Brazil Portuguese Spanish
      • Aruba English
      • Bahamas English
      • Belize English
      • Bermuda English
      • Bolivia Spanish
      • Bonaire English
      • Cayman Islands English
      • Chile Spanish
      • Colombia Spanish
      • Costa Rica Spanish
      • Curacao English
      • Dominican Republic Spanish
      • Ecuador Spanish
      • El Salvador Spanish
      • Grenada English
      • Guadeloupe English
      • Guatemala Spanish
      • Guyana English
      • Haiti English
      • Jamaica English
      • Martinique English
      • Netherland Antilles English
      • Nicaragua Spanish
      • Panama Spanish
      • Paraguay Spanish
      • Peru Spanish
      • Puerto Rico Spanish
      • Saint Lucia English
      • St. Vincent & Grenadines English
      • Suriname English
      • Trinidad & Tobago English
      • Venezuela Spanish
    • Europe
      • Europe

      • Armenia English
      • Austria German
      • Belarus Russian
      • Belgium English
      • Croatia English
      • Czech Republic Czech
      • Denmark English
      • Estonia English
      • Finland English
      • France French
      • Georgia English
      • Germany German
      • Greece Greek
      • Hungary Hungarian
      • Israel English
      • Ireland English
      • Italy Italian
      • Kazakhstan Russian
      • Latvia English
      • Lithuania English
      • The Netherlands Dutch
      • Norway English
      • Poland English
      • Portugal Portuguese
      • Romania English
      • Russia Russian
      • Serbia Russian
      • Slovakia Czech
      • Slovenia English
      • Spain Spanish
      • Sweden English
      • Switzerland French German Italian
      • Turkey Turkish
      • Ukraine English
      • United Kingdom English
      • Azerbaijan Русский
      • Tajikistan Русский
      • Uzbekistan Русский
      • Turkmenistan Русский
    • Middle East
      • Middle East

      • United Arab Emirates English Arabic
      • Qatar English
      • Kuwait English
      • Egypt English
      • Lebanon English Arabic French
      • Iraq English
      • Jordan English
    • Asia Pacific
      • Asia Pacific

      • Mainland of China 选择语言
      • Korea, Republic of (South Korea) Korean
      • Vietnam Vietnamese
      • India English
      • Australia English
      • Japan Japanese
      • Guam English
      • Thailand Thai
      • Taiwan Traditional Chinese
      • Hong Kong SAR English
      • Indonesia English
      • Malaysia English
      • Philippines English
      • Singapore English
      • New Zealand English

How industry visionaries better align building life cycle performance with organizational objectives

By: Louis J. Ronsivalli, Jr

January 10, 2012

When it comes to improving building performance, it's easy to focus on short-term objectives and gains, and to gloss over the long-term effects of the path taken or not. A common short-sighted approach is to focus on individual component efficiency (chillers, air handlers, etc.) without understanding system implications of how these pieces integrate efficiently, or how investments in efficiency upgrades ultimately support the overall organizational mission.

The system deconstruction effect – sometimes referred to as “cherry picking” or “low hanging fruit” – has been the norm when it comes to using “simple economics” such as simple payback to guide decision-making within an organization. This can lead to situations in which partial or incomplete actions are viewed as solutions to performance improvement.

That's why, when it comes to getting our organizations to implement an efficiency and performance improvement program, going beyond the “simple” numbers to capture the longer term view of asset preservation and the economic vision of the c-suite executives and business decision makers is a critical element.

The role of the visionary
Within the building industry, visionaries are taking a life-cycle view to align a building’s mission, embracing the role of facility operations and improved profitability while reducing life cycle costs – all with a harmonious, intra-system approach to operational efficiencies.

These are concepts that get business leaders excited. Improving efficiency and long-term profitability while sustainably reducing costs? That's the best of both worlds for leaders who have taken the time to understand the value of long term asset planning over first-cost, simple economics.

In the new era of energy cost volatility, there has never been a better time to explore a high performance buildings approach.

In the current economy, building owners and operators are simultaneously feeling continuous economic pressures while experiencing heightened social and environmental awareness of their buildings’ impact on the community, occupants and organizations they serve.

"We need to ensure that we have metrics which span all stages of a building’s life, creating great and productive spaces in which we work,” says Martin Townsend, director, Building Research Establishment (United Kingdom). “Ensuring, as we do, that the impact of every building in its construction and use is as efficient as it can be, by turning the data of performance into knowledge for facilities managers to do their jobs – and for occupants – so they can see the impact of their decisions.”

But as technologies and our understanding of building life-cycle dynamics evolve, it is clear that the desired outcomes need to expand well beyond “simple payback” energy economics of years past.

At first glance, one could conclude that these seemingly opposing factors put upward pressure on cost structures. However, visionaries managing these situations continue to develop and test innovative practices to serve building stakeholders more efficiently, reliably and responsibly while achieving goals to decrease overall costs.

Up Next: Part 2 - The 5 key Steps to Adopting a High Performance Buildings Approach

Looking For Parts?

Visit Trane Supply

For General and Corporate Questions:

Contact Us
  • Why Trane
  • Our History
  • News
  • Press Releases
  • Customer Stories
  • Trane Blog
  • Locate a Sales Office
  • Careers
  • Contact Us
  • Environmental Compliance
  • Quality
  • Ethical Business Conduct
  • Supplier Terms
  • Facebook
  • Twitter
  • LinkedIn
  • YouTube

Privacy Policy  |   Terms of Use

Trane Technologies