Challenge
Jungceylon is one of the largest premier shopping and leisure malls located in Phuket. The mall embarked on a mission to transform the shopping mall experience by upgrading the central air conditioning facilities to comply with Singapore's Green Mark platinum standard, while ensuring the upgrading works do not disrupt the mall's operations.
Solution
Trane was selected to upgrade the chiller plant system. Solutions include:
- High accuracy chiller plant control management system complies with Green Mark's measurement and verification requirements.
- New high-efficiency chiller unit with a capacity of 2,200 RT.
- Replaced all major equipment such as water pumps, cooling towers, water treatment systems, ball tube cleaning systems.
- Major design breakthrough in reconfiguring piping layout and converting to a variable flow primary pumping system configuration, leading to high chilled water pumping efficiency.
Result
The upgraded chiller plant achieved a 30.8% energy saving and an operational efficiency of below 0.65 kW/RT, yielding an estimated energy saving of 2,134,113 kWh/year.
Jungceylon successfully achieved demonstrating excellence in energy efficiency and sustainability.