When Carilion wanted to expand their facility to include more diagnostics, therapy tools, and office space, they called on Trane to keep it cool with an integrated solution that provides state-of-the-art control, efficiency, and cost savings.
When West Jefferson Medical Center installed a CyberKnife robotic surgery system, they realized they needed an adequate humidity control system to maintain a precise level of temperature and humidity in the operating room.