Lodging and Entertainment


The Alchemist Brewery

With a number of wash down and boiling procedures inherent in the beer brewing process, humidity control was a top priority as The Alchemist planned construction of its new Stowe facility. Based on a trusted relationship that spanned seventeen years, VHV contacted Trane to discuss project challenges and the best mix of HVAC equipment and controls to support the operation.

Read More

California State Lottery Headquarters

Solar plus storage create Zero Net Energy pavilion; reduce utility costs; help achieve LEED Gold® certification

Read More

Discovery Bay Resort

Chiller solution provides reliable comfort; meets noise abatement and aesthetics challenges; reduces energy consumption and maintenance costs.

Read More

DoubleTree By Hilton Hotel-Market Center

Holistic approach, chiller plant redesign, and optimized controls result in improved comfort, lower energy and operational costs; cost/occupied room reduced by 41 percent.

Read More

4 Bears Casino & Lodge

Trane equipment and controls service and preventive maintenance agreement improves system reliability, facility operations, and comfort; reduces service and maintenance costs by 50 percent.

Read More

Filter

Top