Case Study Results


Merrick & Company

Merrick & Company is an employee-owned $111 million engineering, architecture, design-build, surveying, planning, and geospatial solutions firm, serving a variety of market sectors including energy, national security, nuclear, life sciences and sustainable infrastructure. The company has nearly 500 employees with locations in the United States, Canada, Mexico and Europe.

Read More

TIAA-CREF

TIAA-CREF has improved the comfort, reliability and efficiency of its headquarters building by replacing aging steam absorption chillers with Trane high efficiency chillers, upgrading its cooling towers, and installing an ice thermal storage system. The thermal storage system shifts energy use to off-peak hours, saving approximately $765,000 per year in operating costs, energy use and demand charges. TIAA-CREF is using Trane proprietary optimization control logic to maximize the chiller and cooling tower efficiency. The Trane New York-New Jersey Energy Services team completed this turnkey project for TIAA-CREF.

Read More

Northstar Center

Northstar Center is a three-building complex consisting of two high-rise office buildings and the seventeen-story, twenty-four-hour Crown Plaza Hotel, built atop a six-floor parking garage. Building tenants are extremely diverse, consisting of lawyers, banks, shoe stores and a variety of other businesses.

Read More

Arnprior Regional Health

Energy savings performance contract enables fast-track design and integration of more efficient hot water boiler plant; saves $37,500 in operational/maintenance costs; provides $38,213 in annual energy savings; results in government and utility incentives of $21,000.

Read More

Cook County School District #104

District adopts comprehensive solutions to improve the learning environment for students, while achieving electricity costs that are $70,000 below their expectations.

Read More

Filter

Top